BA II Plus giving wrong answers? Error 1 to 8 and the usual causes
Short answer
Press CE|C to clear an error. Most "wrong" answers come from four things: values left from an earlier problem (use 2NDCLR TVMFV), P/Y not what you think (2NDP/YI/Y shows it), BGN left on, and signs (money paid must be negative).
Numbers checked on 2026-11-23Works on: BA II Plus and BA II Plus Professional
When the answer is wrong but there is no error
Symptom
Likely cause
Check
Payment far too large, or a rate 12 times too small or large
Clear any error with CE|C. The values you entered are kept.
Message
Meaning
Common causes
Error 1
Overflow
A result beyond ±9.9999999999999E99; division by zero (also inside a calculation); 1/x of 0; statistics with all X or Y values the same.
Error 2
Invalid argument
x! of a non-integer or above 69; LN of 0 or less; square root of a negative; AMORT with P2 smaller than P1; depreciation with salvage above cost.
Error 3
Too many pending operations
More than 15 levels of parentheses or 8 pending operations.
Error 4
Out of range
P/Y or C/Y of 0 or less; P1/P2 outside 1-9,999; a cash-flow frequency outside 0.5-9,999 (the guide's range); DEC outside 0-9; a date outside 1980-2079.
Error 5
No solution exists
CPT I/Y with PV, PMT and FV all the same sign; IRR with no sign change in the cash flows.
Error 6
Invalid date
A date that does not exist or is in the wrong format (MM.DDYY); a bond redemption date on or before settlement.
Error 7
Iteration limit exceeded
I/Y, IRR or YLD too complex to solve (often cash flows that change sign several times). Check the inputs; for IRR, look at NPV at a few rates instead.
Error 8
Canceled
A key was pressed while I/Y, IRR, YLD, BAL or a depreciation value was being computed.
Error 5, step by step
Step
Keys
Display shows
What it does
1
2NDCLR TVMFV
0.00
CLR TVM.
2
9000PV
PV= 9,000.00
Loan received, positive.
3
250PMT40N
N= 40.00
Payment also positive (the mistake), 40 payments.
4
CPTI/Y
Error 5
No rate can work.
5
CE|C
N= 0.00
Clear the message.
6
250+|−PMT
PMT= -250.00
Payment negative.
7
CPTI/Y
I/Y= 0.52
The rate per period (P/Y = 1 here).
With the payment negative the rate is I/Y= 0.52% per month. With IRR, Error 5 means every cash flow has the same sign:
How we checked this page: every display above comes from replaying the keys on a tested engine, and the final answer is compared with an independent formula. How we check every answer.