Same keys and same answers for TVM, amortization, NPV, IRR, bonds and statistics. The Professional adds NFV, payback, discounted payback and modified IRR in the cash-flow worksheet, modified duration in the bond worksheet, and room for 32 cash flows instead of 24. If your course uses payback or MIRR, it saves time; otherwise the Plus does the same job.

Numbers checked on 2026-11-24Works on: BA II Plus and BA II Plus Professional

πŸ“± Try these keys on your phone: ba ii Pro, free on Android β†’

The differences

BA II PlusBA II Plus Professional
TVM, amortization, NPV, IRR, bonds, depreciation, statistics, datesYesYes, same keys
Cash flows after CF02432
NFV (net future value)NoYes
Payback and discounted paybackNo (work it out by hand)Yes
Modified IRR (MOD)NoYes
Modified duration in the BOND worksheetNoYes
CFA examOn the CFA Institute listOn the CFA Institute list

Both are on CFA Institute's calculator list at the time of writing; the policy can change, so read the current CFA calculator policy for your exam date. A settings check for exam day is on the CFA calculator page.

What the extra keys do: one project, four answers

A project costs 50,000 today and returns 15,000 in year 1, 18,000 in each of years 2 to 4 and 20,000 in year 5. At 10%, the NPV is NPV= 16,748.73 on both models. The Professional then shows the NFV (NFV= 26,974.00), the payback (PB= 2.94 years) and the discounted payback (DPB= 3.65 years) by scrolling down the same worksheet:

StepKeysDisplay showsWhat it does
1CF2NDCLR WORKCE|CCFo= 0.00Cash-flow worksheet, CLR WORK.
250000+|βˆ’ENTERCFo= -50,000.00CF0: the investment, negative.
3↓15000ENTERC01= 15,000.00C01: year 1.
4↓F01= 1.00F01 = 1.
5↓18000ENTERC02= 18,000.00C02: years 2-4.
6↓3ENTERF02= 3.00F02 = 3.
7↓20000ENTERC03= 20,000.00C03: year 5.
8NPVI= 0.00NPV worksheet: I.
910ENTERI= 10.00Discount rate 10%.
10↓CPTNPV= 16,748.73NPV (both models).
11↓CPTNFV= 26,974.00NFV: the NPV carried to year 5 (Professional only).
12↓CPTPB= 2.94PB: payback in years (Professional only).
13↓CPTDPB= 3.65DPB: discounted payback in years (Professional only).

On the plain BA II Plus, steps 11-13 do not exist. You would add the flows by hand until they cover the cost: 15,000 + 18,000 = 33,000 after year 2, so 17,000 is left out of year 3's 18,000, or about 2.94 years. The same idea with discounted flows gives the discounted payback.

Which one should you get?

Want to practise on your phone? ba ii Pro follows the Professional, so you can try the extra keys before you buy.